When selecting software, you shouldn't purely ask for
the features you need, but also for the features you want.
Pronamics have been listening to the wants of our clients,
and have developed one of the most comprehensive and easy
to use estimating packages available.
Below is a summary of the key features of Expert Estimation
and how they help you with the task of estimating. Please take
some time to review the features on offer and compare them
with your current system.
Below is an index of the main features of Expert Estimation.
Click on the feature for more information.
| Key features
|
What it means for you
|
General Features
|
|
|
24hour x 7day telephone product support*
|
Support when you need it, provided by professional staff
who know the products they support.
|
|
Training included
with the purchase of the product
|
To get the most from your investment and have your
staff up and running quicker, a voucher for participation
in a scheduled, hands-on 1 day training course is included
with your purchase.
|
|
True Windows® application & functionality
|
Reduces the learning curve
for new users who are already familiar with standard
Windows® applications.
Functionality includes:
- The ability to open multiple windows (including
multiple copies of the same window) at the same time
- Cut, Copy, Paste functionality utilising the Windows® clipboard
- Standard Windows® hotkey functionality e.g. ctrl+c (copy), ctrl+v (paste), ctrl+tab (swap
internal window), ctrl+b (bold)
etc
- Standard Windows® look and feel including menus,
toolbars, standard window dialog boxes (open, print
etc),
Windows® appearance, resizing windows etc
- Files may reside
in any location on the local or network computer
and there is no restriction to where projects may
be saved.
- Interactive context
sensitive help system utilising the latest windows
help functionality, allowing you to find the information
you need fast.
|
|
Fully networkable data
|
Multiple users can work on the same project at the
same time.
|
|
Fully networkable licenses
|
Use your licenses effectively by only purchasing the
number of licenses you require to use concurrently.
|
|
Regular application updates*
|
Keeps you at the forefront of technology and the latest
estimating practices
|
|
Project files are portable
|
Each project consists of a separate set of files which
may be located anywhere on your computer or network.
Projects may be copied to other computers via a network,
emailed
or copied on CD's, USB devices, floppy disks
etc.
Expert Estimation also includes a function to zip
and unzip files when copying to make backing-up
and transferring projects even more convenient.
|
|
No limit on the number of estimates that may be created
|
As each project is contained in a separate set of
files, there is no limit to the number of estimates
which may be created.
|
|
The program may be installed on any modern IBM Compatible
PC
|
Use the technology you already have in your office.
For more information, see the Will
Expert Estimation run on my computer? topic in
the FAQ.
|
|
Ability to create new projects that automatically
contain standard or frequently used information
|
Drastically reduce the time it takes for you to set
up a new project by including information that is used
regularly in each project automatically.
|
|
Expert Estimation may be installed easily by the end
user
|
Expert Estimation uses a standard Windows® setup.
The total installation process usually only takes a
few minutes and seven mouse clicks.
|
|
Find & Search
|
Find text anywhere it appears in your project or only
in a specific window.
|
|
Autosave routines to protect your data.
|
Unsaved information that is currently being worked
on is autosaved periodically
to prevent data loss in the event of power or hardware
failure.
|
Help and Support
|
|
|
Comprehensive context sensitive help system with Intellihelp©
|
All of the information you require is easily accessible,
and may be navigated to using a graphical format.
|
|
24hour x 7day telephone product support*
|
Support when you need it, provided by professional staff
who know the products they support.
|
|
Training included in the purchase of the product
|
To get the most from your investment and have your
staff up and running quicker, a voucher for participation
in a scheduled, hands-on 1 day training course is included
with your purchase.
|
Security
|
|
|
Program access may be controlled by user names and
passwords
|
Unauthorised access to the program may be prevented
by users logging in with a username and password.
|
|
Access to all functionality in Expert Estimation may
be controlled by user-defined user types.
|
Control the information your staff can view and edit
by their user type.
|
|
Project file access can be restricted using a password.
|
Sensitive projects may only be viewed or edited by
entering the correct password.
|
Direct Cost & Overhead Cost Schedules
|
The Direct
Cost Schedule is the client's schedule (or
bill of quantities) of items.
The Overhead Cost
Schedule is your schedule of preliminary, or
indirect items such as rent, insurance and telephone
charges.
|
|
No limit on the number of cost items that may be entered
|
Projects may be as simple or complex as required.
|
|
The clients schedule (when provided electronically) may be transferred
directly into Expert Estimation.
|
Quickly and accurately transfer the client's Schedule into
Expert Estimation using a simple copy and paste routine
from any standard Windows® based spreadsheet
or tabular data source.
|
|
Data entry similar to that of most popular windows
spreadsheet packages.
|
If the client has not provided a Schedule electronically
or the schedule is being created in-house, the information
may be entered easily, even by those with limited experience
using the program.
|
|
Overhead (Indirect) costs are estimated in the same
format as direct costs
|
Estimate your Overhead
Costs using the same flexible
Cost Estimate window as used for the Direct
Cost items.
|
|
Copy items from other projects
|
Items estimated previously may be copied from other
projects into your current project, or copied within
the same project.
|
|
Roll-up parent and Child items (or sub items)
|
Conveniently estimate portions of clients items
separately (Child items) and then "roll them up" into
the
Parent item for
submission.
|
|
Each item has a cost estimate worksheet
|
Estimate your costs using First
Principles Estimating. Each Item's Cost
Estimate may
be as complex or simple as you require.
|
|
Each item has a takeoff
|
Calculate your Item quantities
using a flexible Takeoff sheet which includes the
ability to use simple functions
for complex formulae (such as the volume of spheres,
cones etc).
|
|
Each item has a note & references attached
|
Record any important information regarding each Item including specification and drawing references.
|
|
Ability to use font formatting (bold, italic, underline)
|
Reproduce the client's schedule in a similar format
as you have been provided, or highlight specific entries
(section heading, totals etc)
|
|
Items may be one of five item types
|
Enables you to include Contributing,
Rate Only, Hidden
and Included, Excluded and
Provisional Items in your project.
|
|
Items may have one of three item status (colour coded
for easy identification).
|
Ensures that partly estimated Items are not overlooked
prior to submission of your tender, and items that
require checking are reviewed.
Expert Estimation will prevent your project from being
submitted to the client if unfinished items exist.
|
|
Ability to apply text and file references to items
|
Record information such as document and specification
references etc. and attach links to external files
to keep all item information central.
|
|
Anticipated estimate
|
Ability to quickly enter a rate for each Item to
provide a ‘ball-park’ estimate of your project's costs.
|
|
View resource and currency split information
|
View a summary of all Resources contained
in each Item, and the total value of different currencies
in
the item.
|
Cost Estimate
|
Estimate your Items using
as simple or complex calculations as required using
First Principles
Estimating techniques.
|
|
First principles resource based estimating methodology
|
- First Principles
Estimating enables you to obtain
a true analysis of all of the Resources required
to complete the project.
- The Cost Estimate for all items may be readily audited and
is fully justifiable, backed up by the processes required
to complete the
task.
- Changes made to your
resource rates are automatically carried
through to each Item's and Group
resource's estimate that uses the
changed
resource.
- Eliminates the hit
and miss task of finding all of the Resources in
each item if a rate changes when using other
types of "estimating
software" that allow rates to be just "typed
in".
- Utilising
Resource libraries your projects can be estimated
consistently by your staff based on your cost
of using your resources
to perform the work, not just the individual
skill of the estimator to get the numbers right.
|
|
No limit on the number of cost estimate lines (resources)
that may be entered per item
|
Estimates may be as simple or complex as required.
|
|
Resources may be created on-the-fly
|
Create new Resources from
within the Cost Estimate where you will use them.
|
|
Four estimating modes (quantity, unit rate, production,
and time based)
|
So you can produce estimates the way that suits your
business best. You can even use different modes for
different items.
|
|
Wide array of standard formulae
|
Enables you to build up your estimates using simple
or complex functions and analyse your results.
|
|
Inline spreadsheet style calculations may be entered
|
Use as simple or as complex formulae as required to
build up the quantities for your resources.
|
|
Global and local defines (variables)
|
Use Defines (variables) in your calculations that
are available for the Item you
are working on or the project as a whole.
|
|
Copy estimate from other items or other projects
|
Allows you to copy and paste lines of the Cost
Estimate from other
Items or
from other projects into your current project.
|
|
Multiple Cost Estimate Copy
|
Automatically build up Cost
Estimates for projects
that use a standard Item numbering system for their
schedule,
based on either other items in the current project,
a project designed as a template, or any other project.
|
Takeoff
|
A Takeoff calculation window is attached to each Item allowing you to calculate and record quantities required
for
the item and estimate.
|
Item Notes
|
Free text fields are attached to each Item allowing
estimators notes, clarifications etc. to be retained.
|
Resources
|
Resources are
used to easily and consistently build up Cost
Estimates and analyse
your project's resource usage.
|
|
No limit on the number of resources that may be entered
for a project
|
Enter as many Resources as you require to
estimate your project.
|
|
Copy Resources from any standard windows application
|
Save time and ensure your Resources are accurate by
copying your current resource database that is stored
in a standard windows application (such as Microsoft
Excel or Access, or a purchased resource database)
into Expert Estimation.
|
|
Resources may be created in any currency.
|
For projects where Resources are being sourced internationally
or you’re performing an international project, resources
may be created in any currency. Rates are adjusted
for all resources whenever the currency exchange rate
is modified.
|
|
Resources may be created on-the-fly
|
Create new Resources from within the area where you
will use them.
|
|
Any previous projects may be used as libraries for
resources or special library projects may be utilised
|
Use Resources previously
created in other projects or from specially created
Resource libraries to build
up your estimates quicker.
|
|
Base resources split into 4 major types, with 2 unlimited
levels of sort-coding
|
Resources may
be one of 4 types (Labour, Materials, Plant or Subcontract)
which, within them may be grouped
using 2 unlimited sort code levels.
|
|
Base resource rate calculations
|
Base resource rates may be entered directly or may
be calculated using industry standard calculation methods
(for labour and plant) or a calculation sheet (for
materials and subcontract).
|
|
Group (complex or assembly) resources that are capable
of a 9999 level hierarchy.
|
Enables you to estimate Group
Resources for convenient
use in multiple Items/Cost
Estimates. Groups may be estimated as simple or as
complex as required.
Examples of a group resource may be an item of plant which includes an
operator and fuel, or supply and installation of a pump which includes
the pump, some labour and a crane to place, an electrician and a plumber.
Each time a group resource is used, all of the contained resources are
automatically applied.
|
|
Group resources may be estimated using any convenient
base quantity.
|
Estimate your Group
Resources using a quantity that
is convenient to estimate. You are not restricted to
always creating your resources based on one unit.
|
|
Consistent resource rate database
|
Changing a Resource rate in the resource database
will change the rate for that resource throughout your
estimate everywhere it is used, making updating rates
a pain free process.
|
|
Apply a factor to selected resource rates
|
Factor selected Resources to
allow for margins, extra taxes or contingencies, etc.
|
|
Specify resource size and weight for transport
|
Transport reports may be produced based on the size
and weight of Resources being transported to site.
|
|
Recovery Module
|
Determines the depreciation of the capital value of
plant used on your project.
|
|
Outsourcing Module
|
Record details of Resources or
work to be outsourced for future reference.
|
Resource Quotation Analysis Module
|
Analyse the quotations for multiple Resources from
multiple suppliers/subcontractors and transfer the
rates from the selected quoter directly
to your resource database.
|
Multi-Currency
|
Use as many currencies in your project as required
and select a currency to produce your final submission
report in.
This feature is a must when sourcing resources internationally or when
bidding for projects in another country.
|
Project Summary Margins, Profit,
Risks & Opportunities and Adjustments
|
View your project's Direct
costs,
Overhead
costs,
Pre and Post
Margin Adjustments and Margins at
a glance.
|
|
Margin percentages may be applied to the total cost
or contract value, each resource type and cost type
and to specific resource categories independently
|
The flexibility to apply Margins to your project in
whatever method you require. Allows the ability to
apply a percentage margin to all of your costs and/or
individually set margins dependant on what the costs
are related to.
|
|
Record and allow for risks and opportunity events
|
Enables you to quantify the value of risk or opportunity
events and their percentage likelihood of occurring.
|
|
Alter your costs and selling value using pre and post
margin adjustments
|
Pre and Post
Margin Adjustments allow you to either add or
deduct money from the project value quickly prior
to submission without having
to edit your estimates.
|
|
Lump sum margin
|
Add or deduct a fixed value to your projects final
value.
|
Spreading
|
|
|
Item status ensure that the project cannot be spread
and submitted if incomplete items exist
|
This feature prevents the Spread from
being performed if Items remain
that have a status of “unfinished”, ensuring
that you never submit a project with
items that haven't been completely estimated.
|
|
Ability to configure the spread distribution on individual
items
|
Enables you to customise the Spread distribution
over
Items that
you want more or less Margins and/or Overheads to
be applied to than other items.
|
|
Ability to spread specified overhead items over specified
direct cost items
|
Estimate Overheads in
the Overhead costs and have those costs spread over
specific Direct cost
items.
|
|
Spread group facility
|
Ensures recovery of Margin and Overheads for groups
of Items where the item quantity distribution may change
when the work is performed.
|
|
Spread Lock facility
|
Enables you to lock the Selling
rates of Items already
submitted to the client, if the project has additional
or altered items required to be re-submitted.
|
|
Ability to change the spread order, spread methods
and selling value rounding.
|
Configure the Overhead and Margin spread to meet your
projects needs.
|
|
Consumption tax, GST (Goods and Services Tax) and
VAT (Value Added Tax) aware.
|
Expert Estimation has the ability to either incorporate
a tax amount into each Selling
rate and total, or apply
a tax percentage to the final project value.
|
Cashflow
|
|
|
Two methods of producing a cashflow for the project.
Assigning activities to items and estimate lines, or
assigning quantities for each time period to items.
|
Enables you to produce a Cashflow using the method
that suits your project best.
|
|
Activities may be created on-the-fly
|
Create new Activities from within the area where you
allocate them.
|
|
Cashflow results are presented in both tabular and
graphical formats
|
Results may be printed as a report or copied and pasted
to a spreadsheet for further analysis, graphs may be
produced which may be printed or exported using a number
of standard export file formats (BMP, GIF, PNG, WMF,
or Clipboard).
|
|
Resource Flow
|
Allows analysis of both the usage and value of Resources used over the duration of your project.
|
|
Calendar
|
For defining holidays or non-work days
|
Budget
|
|
|
Ability to apply budget cost codes to resources, cost
estimate lines and schedule items.
|
Allows you to Cost
Code your project using as much
detail as required.
|
|
Cost Codes may be created on-the-fly
|
Create new Cost Codes from
within the area where you allocate them.
|
|
Cost Code Flow
|
Combining the Cost
Code allocation with the Cashflow results,
Expert Estimation can produce a Cost Code flow of
the value of each Cost Code over the duration
of the project.
|
RateTrak
|
RateTrak allows you to compare the rates for your
estimates of Items,
sections of Cost Estimates and
Group Resources with
similar estimates either within the same project
or in other historical projects.
|
Reports
|
|
|
Wide range of standard reports
|
Over 50 reports are available for use, many of which
may be formatted to produce the data you require.
|
|
Ability to print & preview reports from the relevant
area within Expert Estimation, or from a list of reports.
|
Print and preview reports from the window that relates
to the report, or from a Report List where reports
may be formatted and printed as a group.
|
|
Ability to export all reports either to the clipboard
for use in other software, to a spreadsheet (.csv)
file or directly into an Excel® spreadsheet.
|
Export your report data directly to Excel® or
to any other standard Windows® application via
the Windows® clipboard.
|
Exporting Data
|
|
|
Copy and paste from most windows
|
Information may be copied and pasted from and to most
windows in Expert Estimation and other standard Windows® applications
(such as Microsoft Word® or Excel®) using
the Windows® clipboard.
|
|
Ability to export project information to project cost
management systems (including Expert Project) for project
cost control.
|
All relevant project
information from Expert Estimation may be imported
into Expert Project for
on-site financial management of the project after
the tender has been won.
Applicable
project information may also be exported to Scenario
Project Manager and COINS
Site Manager for use
in these packages after winning the project. |
|
Ability to export selective project information to
other standard windows applications using the windows
clipboard, export to Excel or to a delimited text file.
|
- Information from
most data windows may be copied and pasted to and
from other standard Windows® applications via
the Windows® clipboard.
- All reports may be
exported to the Windows® clipboard, Microsoft Excel®,
or to a spreadsheet (.csv) file.
- Commonly
used project data may be exported to a standard
text file format (either delimited (.csv etc) or
fixed width
formats)
- The
variety of export options available allows relevant
information to be exported or copied from Expert
Estimation for use in nearly all standard Windows® software including
Accounting, Project Scheduling, Project Management,
Word processor and Spreadsheet applications.
|
|
Other export and import formats
|
- Schedule information
may be imported and exported using the Optus
inCITE (Construction Industry Trading Exchange) standard
format.
- Import bill of quantity
information and submit completed schedule information
from the Queensland Main Roads Departments Tender
Schedules program.
- Ability
to import and export estimate information to and
from Leighton
Holdings Limited's CATS estimating software.
|
Analysis
|
A wide range of analysis tools are available including
the Cashflow,
Cost Code Flow,
Resource Flow,
Spread Analysis,
Quantity Variation
Analysis, Quotation
Analysis,
RateTrak and many more.
|
|
Spread Analysis
|
Analyse your selling item's costs, Margin and
Overhead spread
|
|
Quantity Variation Analysis
|
Compare the effect of quantity changes on your project's
Overhead and Margin recovery
|
|
Item Grouping Summary
|
Analyse your project's costs and selling values based
on user defined group codes.
|
|
Resource Flow
|
The Resource Flow allows analysis of both the usage
and value of resources used over the duration of your
project.
|
|
Cost Code Flow
|
The Cost Code Flow combines the Cost Code allocation
with the cashflow results. Expert Estimation can produce
a cost
code
flow of the value of each cost code over the duration
of the project.
|
|
Project Statistics
|
Displays your project's physical statistics such as,
the number of Items,
Resources, Activities and
Cost
Codes etc.
|
Other
|
|
|
Ability to link images with audio and notes attached
to the project, for site inspection photographs, diagrams
etc
|
Link your site inspection photos with any audio and
notes to your project for future reference.
|
|
To Do window
|
Keep all of the tasks required to be performed for
your estimate on track by assigning tasks and due dates
to team members.
|
|
Project Documents window
|
Record all important project information such as contractual
conditions, closing dates and team meetings in one
central location for easy access.
|
|
Note fields available for the whole project, each
item and each resource
|
Record any details about your project, its Items,
Estimate and Resources for future reference by the
estimating team.
|
|
Company wide INFO window
|
Record any information in a central location that
may be regularly referenced by Expert Estimation users
such as material size and weights, estimating formulae,
plant capabilities etc.
|
|
Projects may be zipped for convenient copying, emailing
etc from within the program (no external software is
required)
|
In-built functionality for zipping, emailing, copying,
moving and renaming projects makes transferring your
project simple.
|
|
Find windows
|
Find any information anywhere in the project using
the "Find in Project" window or using the Find function
for each specific area.
|
|
Direct Cost - Subcontractor Comparison
|
Analyse quotations from subcontractors against your
estimate for schedule items.
|
|
Messages
|
Users on a network can send instant messages to other
Expert Estimation users.
|
|
Options
|
Configure your copy of Expert Estimation to suit each
individual user.
|
More information may be found in the following pages of this web site,
or by contacting